Edit in Desk ↗Draft line pours foamy at The Rusty Cleat — FOB pressure mismatch
Investigatingcolin.bass@bantambarrel.demo · 2026-08-12 21:33:30 · ISS-QC-0003
Customer
The Rusty Cleat
Hampton, NH · owner: colin.bass
Machine / asset
Draft System
serial DS-0105-01 · MACH-0003
DisciplineDraft Lines
PriorityMedium
Spares statusIdentified
Last updated2026-08-15 06:33
Description
The Rusty Cleat reports draft pours running 70–80% foam on tap 3. FOB flow control looks set for a higher-carbonation product than what's currently on that line. Repeatable across two site visits.
Work log
Currently: In progress2 entries- MWmarcus.whelanIn progressAug 14 · 03:33 PM
Bringing a replacement FOB valve on the next delivery run to swap on site.
- MWmarcus.whelanDiagnosedAug 13 · 03:33 AM
Foam ratio tracks with the FOB setting, not with line length or glycol temp. Points at a stale tap-change setting, not the coupler.
Spares required
1
Timeline
colin.bass@bantambarrel.demo2026-08-15 14:33
Marcus is bringing a replacement FOB valve out on tomorrow's delivery run — should have tap 3 pouring clean by end of day.